And the glazing…

finally the small Dauphin

20170130_192112

that’s a big gap to fill with lots of pieces, the overhead panes go in first

20170130_193200

then the main screen, which has needed glued in with CA to get the a quick set to align the body under pressure, and the front door, a sloppy fit with no locating method

20170130_201626

same on the other side

20170130_202507

and the rear doors too

20170130_202754

end result, lots of time getting bits in alignment, and huge gaps everywhere, very frustrating. Just hope it all holds together and sets solid,

Advertisements

One thought on “And the glazing…

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Adopt a Model

eyvallah beğenene, beğenmeyenin canı cehenneme

Plane Dave

World War II with Scale Models

My Forgotten Hobby

Let's build... It's never too late

MEAT FILLED PASTRIES

THIS IS PIE. THESE ARE MY PASTRIES. LET THE GREASE HIT MY ELBOW AND THE GRAVY SMATTER MY FACE.

Shortfinals's Blog

A blog about life, aviation, and everything. Contents © Shortfinals and AirShowConsultants; all rights reserved!

Leading The Line

Because Sometimes There's More to Life Than Pies.

amateur airplanes

Let's build.

Still Striving For that Elusive Halo

Thoughts, photographs, recipes and paintings of an Episcopal priest

Flying the Camel

Large and small projects and thoughts

%d bloggers like this: